- Project summary
A copper riser bank running through the concrete shell of a multi-unit residential development in NW8. Every drop set out, every clip on grid, every joint inspected.
This is what install looks like before the ceilings go in.
- Engagement
MEP first-fix coordinated through the structural concrete shell of a multi-unit residential development. Sentaur's pipework crew worked alongside the main contractor's structural sequence - every drop set out before the slab was poured.
First-fix work on a project of this kind is signed off, witnessed and pressure tested before walls go in. There's no second chance to fix a riser bank.
For a similar engagement on your building, speak to us.